The One leads the Korean industry with years of know-how and specialized technology, It becomes the center of Korean industries.
AMR
Requirements
Stability
Operation plans considering obstacles
Continuity
24/7, 365-day operation plan
Compatibility
Integration with existing infrastructure including security, control systems, and equipment
Economy
Revolutionary cost-saving solutions
Continuity
24-hour & 8-year policy
Always have spare parts available for replacement within 24 hours on site.
Securing a reserve stock of key materials based on the 8-year supply standard for the Ministry of Defense.
Emergency Response Plans
ACS Simultaneous Monitoring
1. Simultaneous monitoring through a network approved by the client
2. Real-time checks with the site manager when issues occur
3. If on-site handling is not possible, dispatch and replace parts within 12 hours
Cause Analysis and Problem Resolution Feedback
1. Analysis and handling of the cause of the problem symptoms
2. Replacement of repaired products at the site
3. Reporting of the problem cause and resolution
Installation & Operating Cost Reduction
Commercialization Status
Renault Samsung Motors AGV
Delivered 7 units to Renault Samsung Motors Busan plant in October 2011
Transports a trolley with 2-3ea, total weight 1.5 tons, from the vehicle sheet metal production plant to the painting plant at a speed of 3 km/h over 1.5 km